top of page
160EF7B2-FEE0-4365-AB71-C28DDEEABE42.JPG

City Walk Delray Beach

2b542d38-88d6-4d5e-adad-b465c353c850.JPG
F9253305-E293-41F1-A0A8-6E883A7F3E18.JPG

01

Traffic Coating

we removed the old traffic coating and prepared the surface for the new one. We used Sika products for a 5 layers sistem to prevent future water infiltration

IMG_2005.jpg
IMG_2816.jpg
536c13a2-c062-46d1-a067-487822a32229.JPG
80d92341-d92f-4f1d-a8ed-f4a07b445050.JPG
IMG_9160.jpg
IMG_2009.jpg
IMG_2395.jpg
IMG_2487.jpg
IMG_2785.jpg
IMG_2881.jpg
IMG_2786_edited.jpg
IMG_2883.jpg

02

Stucco work

we did a demolition of all the loose stucco, previously cheeked with the engineer, then we started the repair process applying the Blue Bonding Agent for a good stickiness of the new stucco 

PHOTO-2025-12-05-17-13-46.jpg

03

Paint

We power washed all the building , protected whatever was not supposed to be painted, 

one coat of primer  and one coat of paint

PHOTO-2025-12-05-17-13-46 (3).jpg
PHOTO-2025-12-05-17-13-46 (2).jpg
PHOTO-2025-12-05-17-13-46 (4).jpg
PHOTO-2025-12-05-17-13-46 (5).jpg
PHOTO-2025-12-05-17-13-46 (6).jpg
PHOTO-2025-12-05-17-13-47 (3).jpg
PHOTO-2025-12-05-17-13-47 (2).jpg
PHOTO-2025-12-05-17-13-47 (1).jpg

© 2035 create by TheConcreteBoyz with Wix.com

  • Instagram
  • TikTok
  • facebook
  • youtube
bottom of page